Search found 3 matches
- Mon Mar 21, 2022 1:07 pm
- Forum: General
- Topic: Water Long Section PPF - Service Clearance
- Replies: 7
- Views: 27021
Re: Water Long Section PPF - Service Clearance
Hi Owen, Thanks for that and after you hit Set Node Details or Regrade Pipes in the WNE, these clearances then appeared on the Water Plot as well or just in the output window? I had the Super Alignment set as a pipe, obvert justified and it was working within the WNE i.e. I could check the output wi...
- Sun Mar 20, 2022 3:47 pm
- Forum: General
- Topic: Water Long Section PPF - Service Clearance
- Replies: 7
- Views: 27021
Re: Water Long Section PPF - Service Clearance
Hi Owen, Is this service upright clearance in the PPF editor supposed to work on Super Alignments in pipe mode as well? Was attempting to do this in V15.0C1b and couldn't get them to appear. Looked at the attriutes of the Super Alignement and it had no attributes set even though the clearance check ...
- Wed Jan 26, 2022 3:37 pm
- Forum: General
- Topic: Hydro File Error
- Replies: 6
- Views: 27451
Re: Hydro File Error
Did you download the "all design rainfalls CSV" from BOM? In V14, only the first 10 columns in the .12dhydro IFD table can be read. If you downloaded the all design rainfalls file, chances are you will have more than 10 columns so if you are trying to run a 1% AEP or 100-year ARI, you will...